Proposed Office Fit Out Works for Energy and Petroleum Regulatory Authority (EPRA)For Nairobi, Nakuru, Isiolo and Lodwar Branches.

 The office fit out works for Energy and Petroleum Regulatory Authority (EPRA) entailed their office spaces  done in Nairobi, Nakuru, Isiolo and Lodwar Branches.

The project was started in December 2021 and completed in December 2022.

The projects entailed design of office partitioning and floor layout plan with workstations, ceiling and associated works.

 Unaitas Gikomba Branch at Nairobi County

The project, Unaitas Gikomba Branch is located in Nairobi.

The project was started in September 2020 and was completed in December 2020.

The construction was of reinforced machine cut stone walling, concrete worktops, gypsum board partitions, shelves, cupboard doors and scratch proof laminate.

The works also include aluminium partitions, balustrades and railings and strong room walls fitted with steel chequered plate.

Proposed Renovations and Alteration Works for Lift, Ct Scan, St. Anne’s Conference Hall and Dining Installations at The Mater Misericordiae Hospital

The project involved the alteration and renovation of a lift shaft, CT Scan installation, relocation of CSSD and St. Annes Conference Hall, relocation of manholes and a ramp to the lift lobby.

The project start date was on 11th March 2022 and the completion date on 27th July 2022.

Refurbishment of Office Space at DCI Headquarters Kiambu Road for Eastern Africa Police Chiefs Cooperation Organization (EAPCCO)

The project is located at Directorate of Criminal Investigation Kiambu Road.

It comprises of office interior fit outs and renovations.

The existing floors were hacked out and new floor finishes installed.

Existing wall tiles hacked out and new tile finish installed.

Taking out of existing acousting ceilings, sanitary fittings and other services.

The works comprised of construction of gypsum board partitions, installation of floor and wall tiles, ceiling works, painting and decoration.

The project started on 21st November 2020 and was completed on 30th January 2021.

Refurbishment works for Huduma Centre at Garissa County

The project started in December 2017 and was completed in February 2018.

It entails maintenance and repair works to existing Huduma centres in Garissa County

Refurbishment works for Huduma Centre at Kilifi County

The projects entails Construction, Maintenance and Repair works to existing Huduma centres in Kilifi County.

Its start dated November 2017 and completion dated May 2018.

Refurbishment works for Huduma Centre at Kwale County

The projects entails Construction, Maintenance and Repair works to existing Huduma centres in Garissa County.

Its start dated November 2017 and completion dated May 2018.

Refurbishment works for Huduma Centre at Mombasa County

The projects entails Construction, Maintenance and Repair works to existing Huduma centres in Garissa County.

It started in November 2017 and was completed in May 2018.