This facility is located in Karen, Nairobi.
The Karen Hospital entails the construction of a five storied Ultra-Modern Heart and General Hospital.
It has 102 beds placed in four wings of a modern structure to ensure that services are accessed with minimum effort at maximum effort to the patients.
The hospital design addressed environmental concerns by use of rainwater, treatment and recycling of wastewater for landscaping and solar heating.
The hospital has the following key facilities with the most modern equipment in the world by any standards today;
- Imaging and diagnostic,
- Catheterisation Laboratory,
- 3 operating theatres,
- Video endoscopy,
- The largest Intensive care unit in East and Central Africa,
- 24 Hour Dialysis Unit,
- Executive suites,
- Physiotherapy,
- Heart clinic and
- Dental Unit
The facility was started in April 2003 and completed in December 2005.