Construction of Nine Industries in Kigali Special Economic Zone (Phase I)

The industrial development located in Kigali comprised of the construction of 5 industries;

  • Ameki Color which occupies a floor area of 11382 SM.
  • Coffee Business Centre sitting on a 4428 SM gross floor area.
  • Premier Tobacco Company on a 9389 SM floor area.
  • The Rwanda Trading Company on a 6093 SM floor area.
  • Tolirwa Industry on a 7712 SM floor area.
  • Type A Industries on a 1788 SM floor area.
  • 5 No. Type B Industries on a 7454 SM floor area.
  • 2 No. Type C Industries on a 7454 SM floor area.

The project started in April 2010 and was completed in July 2012.

 Construction of Five Industries in Kigali Special Economic Zone (Phase II)

Kigali Special Economic Zone (Phase II) was started in October 2012 and completed in November 2014.

The project includes the construction of 9 industries;

  • 2 No. Type A Industries sitting on a floor area of 1788 SM.
  • 5 No. Type B Industries on a 7454 SM floor area.
  • 2 No. Type C Industries on a 7454 SM floor area.

Having started in October 2012 the project was completed in November 2014.

Warehouse for Mt. Kenya Bottlers (Phase I)

Located in Mt. Kenya, this project was started in February 2013 and completed in January 2014.

It comprised of the construction of a new warehouse, extension and refurbishment to an existing warehouse.

Extension to Existing Warehouse and Production Area (Phase II)

This project was started in June 2014 and completed in February 2015.

It is an extension of existing warehouses and Production Area, a Phase II of the Mt. Kenya Bottlers.

Extension to Existing Warehouse and Production Area (PHASE III)

In Phase III of the Mt. Kenya Bottlers, the projects which involved extension of warehouse and production area.

The start of the project was dated April 2015 and the completion dated August 2016.

Fresha Milk Plant – Githunguri

The project is located in Githunguri, Kenya.

It was started in September 2013 and complete in July 2014.

It involves the extension of the production warehouse with food store and milk collection point with a cooler room.

BIC refurbishment for Societe BIC

The Societe BIC project was started in September 2018 and completed in December 2018.

The projects comprise of; refurbishment of washrooms of the old factory office, BIC assembly, covered BIC walkway, cold room including all associated electrical and mechanical services.

Project Cosset for Haco Industries (K) Ltd.

Located in Kasarani, this project was started in January 2019 and completed in February 2020.

It involved the construction of 2 no. warehouses, a service block, chillers, treatment and oil plant,

Independent office block, fencing works and including all associated electrical and mechanical services.