Avenue Hospital located in Thika was a fit out project within an existing building.

The works comprised fit outs with a gross floor area of approximately 2500 SM.

The works involved;

  • Demolition of some of the existing internal walls, tile work and sanitary ware.
  • Construction of a new gypsum board partition.
  • Installation of new floor finishes.
  • Installation of new glazed partitioning, solid concrete walling and gypsum walling.
  • Fixing of frameless glass doors, flush doors and aluminum doors.
  • Installation of lead protected windows and doors in radiology area.
  • Installation of acoustics and drop gypsum ceilings.
  • Associated electrical and mechanical works.

The project was started in January 2019 and completed in June 2019.